PHA — Hazard study (Seveso)
ICPE/Seveso regulatory component
Industrial Risks menu → 3. Hazard-study PHARegulatory PHA for Seveso facilities: initiating event, top event, hazardous phenomenon, consequences, and passive and active risk-control measures.
📷
Screenshot to be added
img/ri-apr-edd-01.png
What you will do
- Describe the initiating event and associated top event.
- Record the hazardous phenomenon and its consequences.
- List passive and active risk-control measures and their effect on the final rating.
Pitfall to avoid. This rating uses the fixed PIGC scales from the hazard-study framework, which differ from generic severity/likelihood scales. Do not modify them; they are prescribed.