Skip to content

Risks ​

This step presents the risk summary calculated from the operational scenarios, with the Severity × Likelihood matrix and a treatment plan.

If no risk has been calculated yet, a message invites you to first generate the operational scenarios (step 5).

Risk distribution ​

KPI cards display the number of scenarios by risk level: Acceptable, To monitor, Unacceptable, Critical.

S × L matrix ​

Grid crossing Severity (rows, S1 to S4) and Likelihood (columns, L1 to L4). Each cell displays the resulting risk level (R1 to R4, color-coded) and a dot per scenario positioned in that cell (hover to see the scenario label). A legend recalls the color / risk level correspondence.

Risk treatment plan ​

Table listing each risk:

ColumnDescription
ScenarioLabel of the associated scenario
SSeverity, editable
LLikelihood, editable
RiskLevel R1-R4, automatically recalculated (Acceptable/To monitor/Unacceptable/Critical)
TreatmentReduction, Transfer, Acceptance, Suppression
Proposed measuresTreatment measures under consideration, free text
NotesFree notes

Risks at Unacceptable or Critical level (≥ R3) are highlighted by a tinted row.

Level consistency

Changing S or L in this table immediately updates the risk badge and the position in the matrix — but does not automatically propagate back to the original operational scenario (editing S/L at the source is done instead in 5 — Operational scen.).

Polyodos — Documentation utilisateur